Blog
Discover our latest articles and blogs

Avoid Under Ventilation: VAV vs CAV IAQ and Controls for Engineers
HVAC engineers: weigh VAV and CAV on controls, IAQ risk, and 10 year operating cost. Use Bazini Engineering's checklist to prevent under ventilation and...

LL88 Lighting Upgrades: Avoid BEAM Rejections and $1,500 Fines in NYC
LL88 lighting upgrades for NYC owners: confirm 25,000 sq ft coverage, find post 2010 permits, avoid BEAM rejections and $1,500 annual fines.

Three Metrics That Nail Commercial Water Heater Sizing for Facilities
Tool based checklist: build a demand profile, use IAPMO/ASHRAE tools, size storage vs recovery, and commission the system to avoid plan review delays.

NYC Owners: Local Law 97 Exemptions Are Limited. Use Article 320.7
NYC building owners: exemptions under Local Law 97 are narrow. Learn when the 25,000 GSF threshold applies, how Article 320.7 adjustments work, and what...

Cut Commissioning Hours: Engineer's BACnet vs Modbus for Mixed Systems
Engineer focused guide to using BACnet or Modbus on real projects. Learn the 15–25% equipment tradeoff, gateway mapping, security fixes, and a...

IECC Rules and 40% Savings: Bazini's DCV Checklist for U.S. Facilities
Engineering-first DCV explainer for U.S. facility managers: IECC/ASHRAE triggers, field energy ranges up to 40%, and Bazini's implementation checklist.

$268/ton and $0.50/sq ft Fines: Local Law 97 Playbook for NYC Owners
Understand Local Law 97 penalties, $268 per ton and $0.50 per sq ft, and follow a step by step engineering checklist, filing timeline, and mitigation...

NEC Compliant Fault Current Calculation for Engineers: 750 kVA Example
Engineer-focused fault current calculation with exact transformer Isc and point to point formulas, a 750 kVA worked example, and a Bazini checklist for...

Avoid a Second 20 Day Delay: Con Edison Load Letter Checklist for NYC
NYC teams: Use Bazini Engineering's checklist to submit your Con Edison load letter once. File before permits and avoid a second 20 day delay.