Blog
Discover our latest articles and blogs

HVAC Noise Control: How to Design, Diagnose and Fix Noisy Systems
Learn how HVAC noise control works: noise targets, vibration isolation, duct silencer selection and outdoor equipment fixes, from an NYC MEP engineering firm.

FDNY Fire Alarm Filing: Process, Fees and Common Rejections
How an FDNY fire alarm filing works in NYC: who can file, what documents you need, the $585 fee, inspection steps and the mistakes that cause rejections.

U.S. Electrical Room Clearance: 3–5 Feet, NEC Rules and Layout Advice
Check U.S. electrical room clearance under NEC and OSHA: working depths of 3 to 5 feet, width and height minimums, egress, and layout advice.

Roof Drains vs Scuppers: Two Systems, One Engineer Checklist
Compare roof drains and scuppers by flow, code sizing, roof layout, overflow, and maintenance, then prepare the right questions for your MEP engineer.

IECC vs. ASHRAE 90.1: U.S. Teams Check Adoption to Avoid Rework
Compare IECC and ASHRAE 90.1, verify your local authority’s adopted edition, and choose a compliance path before design decisions lead to rework.

Makeup Air Requirements: What the 400 CFM Code Trigger Means
See why IRC sets a 400 CFM makeup air trigger, how IMC differs, which supply options contractors use, and what inspectors check before approval.

Wet vs. Dry Sprinklers: An Engineer’s Call on Freeze Risk
Compare wet and dry sprinkler systems with an engineer’s view of freeze risk, response time, water damage, and maintenance. Choose the right fit.

Steam vs Hot Water: Engineer Checklist and Permit Steps for Owners
Engineer first verdict on steam vs hot water for owners and managers. Radiator by radiator checklist, permit musts, and bid specs to guide retrofit decisions.

2019–2023 Con Ed Gas Moratorium: What NY Owners Must Do
How the 2019–2023 Con Ed gas moratorium ended, what the PSC now requires, and a practical verification checklist for NY building owners and project teams.