Blog
Discover our latest articles and blogs

How to Respond to NYC DOB Objections: A Practical Guide
Learn how to respond to NYC DOB objections: plan exam comments, inspection objections and violations, with the documents, steps and mistakes to avoid.

NYC ALT2 Filing: What It Covers and How to File in DOB NOW
What an NYC ALT2 filing is, which projects fit, who can file, what DOB NOW requires, and how MEP scope shapes the permit path from filing to sign-off.

Smoke Detector Spacing: NFPA 72 Rules for Commercial Buildings
Smoke detector spacing under NFPA 72: the 30-foot rule, the 21-foot coverage radius, walls, beams, airflow and when a design needs an engineer.

Elevator Machine Room Cooling: Code, Sizing and Design
How to cool an elevator machine room: what the code requires, temperature limits, how to size ventilation, and what NYC building owners should check first.

NYC Energy Code 2026: What the 2025 NYCECC Requires
The 2025 NYC Energy Conservation Code has been enforced since March 30, 2026. See which edition applies to your project and what to file for compliance.

Sprinkler Head Spacing: NFPA 13 Rules and Design Pitfalls
How fire sprinkler head spacing works under NFPA 13: coverage area, wall distances, obstructions, the small room rule, and preaction vs. deluge systems.

Emergency Lighting Code in NYC: What Owners Must Meet
NYC emergency lighting and exit sign requirements explained: 90-minute duration, footcandle levels, uniformity, FDNY testing and what to do before you retrofit.

Stormwater Detention in NYC: What Owners and Designers Need
How NYC stormwater detention works under the Unified Stormwater Rule: triggers, release rates, blue roofs, tanks and the filing steps that keep projects moving.

Booster Pump Sizing for Commercial and Multifamily Buildings
How to size a domestic water booster pump: flow, boost, elevation, friction and suction pressure, with a worked example and NYC permitting notes.