Hospital ventilation compliance in the United States rests on ANSI/ASHRAE/ASHE Standard 170, CMS survey expectations, and applicable NFPA and CDC guidance, all enforced together rather than in isolation. Facility teams should immediately verify air changes per hour for each space type, confirm pressure differentials on isolation and operating rooms, check filtration ratings against space requirements, and review any relative humidity waivers on file. Confirming which Standard 170 edition your authority having jurisdiction enforces and then pulling recent test and balance records resolves most survey findings before they happen.
TL;DR:
- Facilities must confirm the enforced edition of Standard 170 and any local amendments before designing or verifying ventilation systems to avoid costly rework.
- Achieving compliance depends on verifying actual airflow, pressure, filtration efficacy, and humidity, not just calculations or original design documents.
- Regular testing and re-verification, particularly after renovations or equipment changes, are crucial to ensure ongoing pressure relationships and airflow targets are maintained.
- Continuous monitoring with alarms, routine inspections, and recordkeeping for pressure and airflow are essential for operational compliance and outbreak readiness.
- Ventilation strategies should be integrated with infection control programs and tailored to each space's specific clinical use to ensure safety and efficiency.
Table of Contents
- Which standards and federal regulations apply in U.S. hospitals
- Space-specific numeric requirements: ACH, pressure, filtration, and humidity
- Testing, commissioning, and verification: TAB, pressure testing, and airflow measurement
- Operational monitoring and maintenance: alarms, inspection cadence, and recordkeeping
- Water management and Legionella risk tied to ventilation and humidification
- AHJ and survey readiness checklist for facility managers
- Field-proven engineering guidance from Bazini Engineering and author Joseph
- Integration of ventilation systems with hospital infection control programs
- Ventilation requirements specific to different hospital departments beyond isolation and OR
- Guidance on addressing variable occupancy and demand-responsive ventilation in hospitals
- Design considerations for retrofit versus new construction hospital ventilation systems
- Energy efficiency and sustainability practices specific to hospital ventilation
- Emergency ventilation protocols during infectious disease outbreaks
- Practical priorities: balancing code compliance with operational realities
- Bazini Engineering services for ventilation compliance and commissioning
- Sources
- FAQ
Which standards and federal regulations apply in U.S. hospitals
Hospital ventilation compliance is not governed by a single rulebook. It sits at the intersection of a technical consensus standard, a federal payment condition, a life safety code, and workplace protections, and surveyors move between all four depending on what they are checking.
ANSI/ASHRAE/ASHE Standard 170 is the primary national standard for health care facility ventilation. It sets minimum air change rates, pressure relationships, and filtration requirements by space type, and the 2025 edition adds provisions for optional natural ventilation, updated imaging room classifications, and behavioral health space criteria. Most state health departments and the Facility Guidelines Institute reference Standard 170 by edition, which means the version in force at your facility depends on when your state last adopted an update.
CMS does not write its own ventilation numbers. Instead, its Conditions of Participation and survey memoranda point back to Standard 170 and to water management expectations, then hold facilities accountable through the survey process. A hospital that cannot produce documentation showing it meets the referenced criteria risks a deficiency citation regardless of how the air actually performs.
NFPA enters through the Life Safety Code and NFPA 99, which address smoke control, fire dampers, and certain electrical and gas system interactions with air handling, rather than duplicating Standard 170's air change or pressure tables. OSHA's role is narrower and mostly procedural: general duty clauses and respiratory protection standards apply during outbreak response and construction, but OSHA does not publish hospital-specific ACH or pressure numbers.
Before any design or survey preparation work begins, confirm:
- Which edition of Standard 170 your state or authority having jurisdiction currently enforces, since older facilities may still be held to a prior edition.
- Whether your state health department has adopted amendments that tighten or modify any Standard 170 minimum.
- Which NFPA 99 and Life Safety Code provisions apply to your occupancy classification.
- Whether recent renovations triggered a requirement to meet the current edition rather than the one in force when the building was originally licensed.
Getting this hierarchy straight early saves rework. An engineer designing to the wrong edition, or a facility manager assembling survey documentation against the wrong benchmark, ends up redoing calculations that should have taken one phone call to the state agency.
Space-specific numeric requirements: ACH, pressure, filtration, and humidity
Once the governing edition is confirmed, the actual compliance work comes down to four measurable variables: air changes per hour, pressure differential, filtration efficiency, and relative humidity. Each has a target that varies by space type, and each interacts with the others in ways that trip up teams who optimize one number without checking the rest.
Air changes per hour is calculated as:
ACH = (airflow in cubic feet per minute × 60) ÷ room volume in cubic feet
A 1,200 cubic foot isolation room supplied with 240 CFM of total air delivers 12 ACH: (240 × 60) ÷ 1,200 = 12. That figure matters because CDC guidance ties ACH directly to how quickly airborne contaminants clear a room, with higher rates removing contaminants faster.
Airborne infection isolation rooms illustrate how the numbers have shifted over time. Older facilities may still operate under a 6 ACH minimum, but current recommendations favor targeting 12 ACH for new or renovated AIIRs wherever feasible. Pressure matters just as much as airflow volume: AIIRs should maintain negative pressure of at least 0.01 inches of water gauge, roughly 2.5 pascals, relative to the corridor, and that differential needs to hold under all operating modes, not just at commissioning.
Operating rooms and other protective environments run the opposite direction, holding positive pressure relative to adjacent spaces to keep unfiltered air from migrating in. Standard 170 sets minimum total and outdoor air change rates by space type, and facility engineers should treat those figures as floors, not targets, when patient risk or infection control programs justify going higher.
| Space type | Typical pressure relationship | Reference ACH consideration |
|---|---|---|
| Airborne infection isolation room | Negative, ≥0.01 in. w.g. | 12 ACH recommended for new/renovated rooms |
| Operating room | Positive | Set per Standard 170 minimum for the space |
| Protective environment room | Positive | Set per Standard 170 minimum for the space |
| Critical care / ICU | Per Standard 170 designation | Set per Standard 170 minimum for the space |
Filtration is the third variable, and it is easy to get backward. Most inpatient areas run on a MERV baseline sufficient for general particulate control, while spaces with higher infection control stakes, such as protective environment rooms for immunocompromised patients, call for HEPA filtration. The catch is mechanical: swapping to a denser filter increases static pressure resistance, and if the fan cannot overcome that added resistance, delivered airflow drops. That drop can silently undercut both your ACH number and your pressure differential at the same time, which is why ASHE's ventilation guidance warns that airflow changes must be evaluated holistically rather than as an isolated filter swap.
Relative humidity rounds out the list, mainly in anesthetizing locations. CMS's categorical waiver permits these spaces to operate at a lower bound of 20% relative humidity, down from the older 35% threshold, provided the setting is compatible with the manufacturer's instructions for use on any humidity-sensitive equipment in the room. Facilities relying on this waiver need it documented in writing, tied to specific equipment IFUs, not assumed as a blanket policy.
Four numbers, four interactions:
- Raising ACH without checking pressure can disturb the room's directional airflow instead of improving it.
- Upgrading filtration without checking fan capacity can quietly lower both ACH and pressure differential.
- Lowering RH below 35% is only defensible with the CMS waiver and matching device IFU documentation on file.
- Every number needs to be verified against the specific edition of Standard 170 your AHJ enforces, since minimums shift between editions.
Testing, commissioning, and verification: TAB, pressure testing, and airflow measurement
Design calculations mean little until field measurements confirm the installed system performs as drawn. Test and balance work, commonly called TAB, is the formal process of measuring, adjusting, and documenting actual airflow, and it is the single most common piece of evidence surveyors ask to see.

A complete TAB report documents supply, return, and exhaust airflow at each diffuser and grille, room pressure differentials measured with a calibrated manometer, and a comparison against design values with any adjustments recorded. Re-TAB is warranted after any renovation that touches ductwork or room envelope, after equipment replacement such as a new air handler or fan, and on a periodic basis even without construction, since duct leakage, damper drift, and filter loading change performance over time.
Field verification typically combines several tools. A balometer or flow hood measures actual CFM at a diffuser and compares it against the design value stamped on the drawings. A manometer reads the pressure differential between a protected space and its corridor, confirming whether an isolation room is actually holding negative pressure or an OR is holding positive. A simple smoke test, using a smoke pencil or tube at the door undercut, gives an immediate visual read on airflow direction before anyone pulls out instrumentation, and it remains one of the fastest ways to catch a reversed relationship before a patient occupies the room.
Documentation to retain, ideally in a single compliance binder or digital folder surveyors can review quickly:
- Current engineering drawings showing design airflow, ACH, and pressure relationships for each space.
- The most recent TAB report with dated field measurements and any deficiency corrections noted.
- Commissioning sign-off documentation from original construction or the most recent major renovation.
- A log of any deviations found and the corrective work order that resolved them.
Pro Tip: Before scheduling a full TAB visit, walk the space with a smoke pencil at the door undercut and any wall penetrations. Catching a reversed pressure relationship this way costs a few minutes; catching it during a survey costs a citation.
The most common field failures are mundane rather than exotic. Undocumented exhaust points, an adjacent bathroom fan or a local equipment hood tied into the same exhaust branch, throw off calculated ACH and pressurization because nobody accounted for the extra draw. A poorly sealed room envelope, gaps around cable penetrations or an undercut door that is too generous, can defeat an otherwise correctly balanced system. Loaded filters increase static pressure gradually, which means an AIIR that passed commissioning at 12 ACH can drift below its target months later without anyone touching a damper. Field NIOSH surveillance work has found that a meaningful share of AIIRs fail to hold their recommended pressure differential in practice, which is exactly why periodic re-verification matters more than a one-time commissioning stamp.
Operational monitoring and maintenance: alarms, inspection cadence, and recordkeeping
Commissioning proves a system worked on the day it was tested. Ongoing monitoring is what proves it still works six months later, and it is what most surveyors probe hardest because it reflects daily operational discipline rather than a one-time engineering exercise.
- Install continuous differential pressure monitors on AIIRs, protective environment rooms, and ORs, with alarm setpoints tied to the minimum required differential so staff get notified before the room drifts out of compliance rather than after.
- Set an inspection cadence: an annual comprehensive HVAC inspection at minimum, periodic TAB spot checks on high-risk rooms between full re-TAB cycles, and a filter replacement schedule driven by static pressure readings rather than a fixed calendar alone.
- Keep sensor trend logs long enough to demonstrate a pattern of compliance, not just a snapshot, since a single good reading during a survey window does not answer whether the room held pressure the rest of the year.
- Maintain a standing file of commissioning reports, maintenance work orders, and any deficiency corrections, organized by room or air handling unit so a surveyor asking about a specific isolation room gets a direct answer instead of a search.
- When replacing air handling equipment, humidification components, or room finishes, cross-check the manufacturer's instructions for use against your target relative humidity and temperature range before finalizing setpoints, since some medical equipment IFUs specify humidity bands narrower than the CMS waiver's outer limits.
Alarm fatigue is worth naming directly. A pressure monitor with an alarm threshold set too tight will nag constantly and get ignored; set too loose, and it fails at its one job. ASHE's Project Firstline guidance recommends treating any airflow adjustment as an engineering decision rather than a maintenance shortcut, precisely because a setpoint change made to quiet an alarm can unintentionally alter the room's pressure relationship.
Water management and Legionella risk tied to ventilation and humidification
Water management and air handling intersect wherever aerosols form: cooling towers, humidifiers, decorative fountains, and even some ice machines. CMS expects every hospital to maintain a water management program built around a documented facility risk assessment, consistent with ASHRAE guidance and the CDC's water management toolkit, specifically to reduce Legionella risk.

The HVAC connection matters most where humidification equipment introduces water directly into the airstream. A steam or evaporative humidifier that is not maintained on schedule can become a colonization site, and the setpoint chosen to satisfy an anesthetizing location's relative humidity range should be coordinated with whoever manages the water management plan rather than set in isolation by the mechanical team.
Facilities relying on the RH waiver's lower bound need that decision documented alongside the water management risk assessment, not as a separate, disconnected record. Surveyors reviewing a hospital's Legionella controls typically expect:
- A written water management program identifying aerosol-generating equipment, including humidifiers, cooling towers, and decorative water features.
- Evidence of a facility-specific risk assessment rather than a generic template.
- Maintenance and monitoring records for humidification equipment, since CMS guidance treats provider testing frequency as discretionary but expects a documented rationale.
- Coordination notes showing HVAC setpoints and water treatment protocols were considered together, not independently.
A facility that can show its humidification setpoint decision and its water management plan were made by people talking to each other has a materially easier survey conversation than one presenting two disconnected binders.
AHJ and survey readiness checklist for facility managers
Survey preparation goes faster when it is organized as a checklist rather than a general review. The sequence below mirrors how a surveyor typically works through a facility.
- Confirm the exact edition of Standard 170 and any state amendments your authority having jurisdiction currently enforces, and build a one-page map showing which criteria apply to which space in your building.
- Pull current engineering drawings for every space with a required pressure relationship, and confirm they match what was actually installed, not just what was originally designed.
- Assemble the most recent TAB report, the original commissioning sign-off, and any deficiency correction records, organized by room.
- Gather sensor trend logs from continuous pressure monitors covering a representative period, not just the days immediately before the survey.
- Document any active waivers, most commonly the RH waiver, with the specific manufacturer IFUs and risk justification that support the decision.
- Confirm the water management program and its risk assessment are current and cross-referenced with humidification setpoints.
- Assign a specific staff contact for HVAC questions who can produce documents on request and who knows how to run a quick smoke test or balometer check if a surveyor wants a live demonstration.
- Prepare brief, factual talking points for each flagged space rather than lengthy explanations, since surveyors respond better to direct answers than to defensive detail.
| Document | Purpose | Owner should confirm |
|---|---|---|
| Current Standard 170 edition mapping | Shows which criteria apply where | Matches AHJ-enforced edition |
| TAB report | Proves measured performance | Dated within current cycle |
| Commissioning sign-off | Proves original installation met design | On file and legible |
| Water management plan | Shows Legionella risk controls | Cross-referenced with HVAC setpoints |
| RH waiver documentation | Justifies humidity setpoint | Tied to specific device IFUs |
Field-proven engineering guidance from Bazini Engineering and author Joseph
The failure modes engineers see most often in the field are rarely dramatic. A negative pressure room loses its differential because a contractor sealed one penetration but missed the gap above a dropped ceiling tile. An older hospital wing hits its ACH target on paper but falls short in practice because a duct damper was left partially closed after a previous repair. Correcting these usually costs far less than the original diagnosis, once someone actually measures the room instead of trusting the as-built drawing.
For phased upgrades in budget-constrained facilities, the efficient order is: verify pressure relationships and envelope sealing first, since that work is comparatively cheap and immediately reduces cross-contamination risk, then address ACH shortfalls through fan or ductwork changes, and treat filtration upgrades as a distinct project that gets its own fan capacity check rather than being bundled in as an afterthought.
Pro Tip: Budget TAB and commissioning verification as a line item in every upgrade phase, not as a closeout formality. A room that passes on paper but has not been field-verified is not yet compliant.
Integration of ventilation systems with hospital infection control programs
Ventilation performs best as one control layer inside a broader infection control program, not as a standalone mechanical checkbox. Infection preventionists set the clinical requirements, such as which patients need airborne isolation, and facility engineering translates those requirements into pressure relationships, ACH targets, and filtration choices that the mechanical system can actually sustain.
That coordination needs to run both directions. Facility teams should flag to infection control staff when a room's pressure differential drifts or when filter loading is approaching a threshold that will affect delivered airflow, since a room that is nominally an AIIR but is not currently holding its differential is not functioning as one regardless of the sign on the door. Infection control staff, in turn, should notify facilities before repurposing a space for isolation use if that room was not originally designed to that standard.
Joint rounds, where facilities and infection control walk high-risk spaces together on a recurring basis, catch problems that neither team spots alone: a facilities engineer notices airflow issues, while infection control notices a workflow change that increased door-opening frequency and disrupted pressure stability. Building that communication loop into a routine, rather than treating it as an incident response, is what keeps a hospital's isolation capacity reliable between surveys, not just on the day of one.
Ventilation requirements specific to different hospital departments beyond isolation and OR
Isolation rooms and operating rooms get most of the attention, but Standard 170 sets space-specific criteria across the rest of the hospital as well, and each department carries its own practical wrinkle.
Diagnostic radiology and imaging suites need airflow and pressure relationships suited to equipment heat loads and, in some cases, contrast media handling, and the 2025 edition of Standard 170 specifically updated imaging room classifications to reflect how these spaces are actually used today.
Pharmacies, particularly compounding areas, follow criteria that overlap with USP sterile compounding requirements, meaning airflow and pressure decisions there often need to satisfy both Standard 170 and pharmacy-specific compounding standards simultaneously.
Laboratories handling specimens or reagents typically need negative pressure relative to adjacent corridors to contain fumes and biological material, similar in principle to isolation rooms but driven by chemical and biosafety concerns rather than airborne infection control.
Behavioral health units, also newly addressed in the 2025 Standard 170 update, balance ventilation performance against patient safety hardware, since standard diffuser and grille designs can pose ligature risk and need specialized fixtures that still meet airflow targets.
The throughline across all of these: a department's ventilation requirement is never generic. Each one derives from what happens in that room clinically, and a facility manager treating every non-isolation, non-OR space as "standard" risks missing a criterion specific to that department's actual use.
Guidance on addressing variable occupancy and demand-responsive ventilation in hospitals
Hospital occupancy swings throughout the day and across departments, and constant-volume systems sized for peak demand waste energy during the many hours a space runs below capacity. Demand-responsive ventilation adjusts airflow based on measured conditions such as occupancy sensors, carbon dioxide levels, or scheduled use patterns, rather than running every space at a fixed maximum around the clock.
The complication in a hospital is that critical spaces cannot simply throttle down. An AIIR or OR needs to maintain its required ACH and pressure differential regardless of whether a patient is currently present, because the room's readiness, not its current occupancy, is what infection control depends on. Demand-responsive strategies are far more appropriate in lower-acuity, variable-use spaces: waiting areas, administrative offices, conference rooms, and general corridors, where occupancy genuinely varies and a temporary reduction in airflow carries no infection control consequence.
The practical approach is a tiered one: lock critical care, isolation, and OR spaces to their Standard 170 minimums at all times, and apply demand control only to the general and administrative square footage where variable occupancy is real and the consequences of scaling back are negligible. Facilities that try to apply demand-responsive logic to isolation rooms to save energy are taking on infection control risk for a marginal efficiency gain, and that trade rarely holds up under survey scrutiny.
Design considerations for retrofit versus new construction hospital ventilation systems
New construction gives an engineer a clean slate: duct routing, fan sizing, and room layout can all be optimized together from the first drawing set. Retrofit work almost never gets that luxury, and the design constraints show up differently depending on which side of the project you are on.
In new construction, the main task is applying the current Standard 170 edition correctly across every space type from the start, sizing fans with margin for future filtration upgrades, and routing dedicated exhaust for every space with a required pressure relationship using fully ducted systems rather than shared plenums.
In retrofit projects, the existing building envelope, duct routing, and fan capacity all constrain what is achievable, and the first real task is a field audit, not a design exercise. That means measuring actual current ACH and pressure performance before assuming the as-built drawings are accurate, checking whether the existing fan has any static pressure margin left for a filtration upgrade, and identifying every exhaust point serving a room, including small ones like an adjacent bathroom fan, since those undocumented exhausts are a common source of retrofit calculation errors.
Retrofit budgets also need to account for the reality that fixing pressure relationships often means addressing the room envelope, sealing penetrations, adjusting door undercuts, and correcting duct leakage, rather than simply reprogramming a control sequence. That work is frequently cheaper than a full duct replacement, but it needs to be scoped explicitly rather than assumed to be included in a mechanical upgrade quote.
Energy efficiency and sustainability practices specific to hospital ventilation
Hospitals run ventilation systems at rates far higher than typical commercial buildings, which makes energy efficiency work in this sector different from a standard office retrofit. The starting principle has to be that critical space minimums are non-negotiable: energy savings come from managing the spaces that do not carry a fixed ACH or pressure floor, not from trimming isolation rooms or ORs.
Heat recovery ventilation, capturing energy from exhaust air to precondition incoming outdoor air, is one of the more effective levers in healthcare settings specifically because hospitals move so much outdoor air continuously to meet ventilation minimums. Variable air volume strategies applied to non-critical spaces, paired with the demand-responsive approach described earlier, reduce fan energy without touching any space that has a fixed requirement.
Filtration choices also carry an energy dimension worth weighing deliberately. A higher MERV or HEPA filter increases static pressure resistance, which means the fan works harder to deliver the same airflow, and that added energy cost needs to be part of the decision alongside the infection control benefit, not treated as a side effect discovered later on a utility bill.
The practical sequencing for a facility manager pursuing efficiency gains: confirm every critical space is verified at its required minimum first, then look for energy recovery and demand control opportunities in the remaining square footage, and evaluate any filtration upgrade's fan energy cost alongside its infection control value before approving it.
Emergency ventilation protocols during infectious disease outbreaks
Outbreak response puts sudden pressure on isolation capacity that routine operations rarely test. A hospital's plan needs to answer, in advance, how many AIIR-equivalent spaces it can stand up beyond its permanent isolation rooms if patient volume spikes.
Temporary conversion of standard patient rooms into isolation-capable spaces is the most common surge strategy, and it depends on portable HEPA filtration units to supplement fixed ductwork, since a standard room's exhaust and pressure relationship were never designed for negative pressure operation. Any converted room needs the same verification steps as a permanent AIIR: a smoke test to confirm directional airflow, a manometer reading to confirm the pressure differential, and documentation showing the conversion meets an acceptable minimum even if it does not match a purpose-built room's full specification.

Emergency protocols also need a clear trigger and stand-down process. Facilities should define in advance what occupancy or clinical threshold activates surge isolation conversions, who authorizes it, and what the process is for returning converted rooms to standard use once the outbreak subsides, including re-verification that the room's original pressure relationship and airflow have been restored.
Coordination with infection control during an outbreak is tighter and faster than routine operations allow for, which is exactly why the joint rounds and communication habits built during normal operation pay off most when they are tested under real surge conditions rather than improvised for the first time during one.
Practical priorities: balancing code compliance with operational realities
Facility managers rarely get to fix everything at once, and the honest answer is that sealing a room's envelope to hold its pressure differential should almost always come before chasing a higher ACH number. A room that hits 12 air changes but leaks pressure through an unsealed penetration is not safer than one holding 8 ACH with a tight envelope and a verified differential.
Phasing works best when it follows risk, not convenience: verify and seal your highest-risk isolation and OR spaces first, then work outward to lower-acuity spaces on a documented timeline. When presenting this to leadership, skip the technical detail and lead with the risk and the dollar figure for each phase, then show the sequence. Boards fund clear priorities faster than long explanations.
— Joseph
Bazini Engineering services for ventilation compliance and commissioning
Getting a hospital ventilation system from "designed on paper" to "verified and survey-ready" usually takes more than one discipline working in isolation, which is exactly the gap Bazini Engineering is set up to close. Rather than handing a facility team a set of drawings and leaving TAB coordination, permit filing, and agency questions to be sorted out separately, Bazini Engineering keeps mechanical design, compliance documentation, and agency coordination under one roof.

Their work on hospital and health care facility projects typically includes:
- Mechanical engineering design for HVAC systems serving various hospital spaces.
- Coordination of test and balance verification alongside engineering drawings to check design intent and field performance.
- Coordination of water management and plumbing systems related to humidification and Legionella controls.
- Permit filing support for facilities navigating local agency reviews alongside federal and state requirements.
If your facility needs a scope review before your next survey cycle or renovation phase, Bazini Engineering's services page is the place to start that conversation.
This article is general information, not a substitute for advice from a qualified doctor. Consult a qualified healthcare professional about your own circumstances before acting on anything here.
Sources
FAQ
What are the OSHA regulations regarding air ventilation?
OSHA does not publish hospital-specific ACH or pressure numbers; its role is mostly procedural, applying general duty and respiratory protection standards during construction and outbreak response. Hospital ventilation design and pressure criteria come primarily from ANSI/ASHRAE/ASHE Standard 170, enforced through CMS survey processes and state adoption.
How many air changes per hour are required in a hospital?
Air change requirements vary by space type under Standard 170, with airborne infection isolation rooms often built to an older 6 ACH minimum but current guidance recommending a target of 12 ACH for new or renovated rooms. Operating rooms and critical care areas carry their own minimums set by the specific edition your facility follows.
What is the ASHRAE standard for ventilation?
ANSI/ASHRAE/ASHE Standard 170 is the national consensus standard governing ventilation of health care facilities in the United States, setting minimum air change rates, pressure relationships, and filtration requirements by space type. The 2025 edition added updates for natural ventilation options, imaging room classifications, and behavioral health spaces.
What are the requirements for ventilation in isolation rooms?
Airborne infection isolation rooms need negative pressure of at least 0.01 inches of water gauge relative to the corridor, along with an air change rate meeting the applicable Standard 170 minimum for that space. Facilities should verify both figures with a manometer and airflow measurement rather than relying on original design documents alone.
Can hospitals lower relative humidity in operating rooms?
CMS permits a categorical waiver allowing anesthetizing locations to operate at a relative humidity as low as 20%, down from the older 35% threshold, provided the setting is compatible with equipment manufacturer instructions for use.